Framework Agreement
Consent Order Extensions
TRU Quarterly Status Reports
Below-Ground Transuranic Waste Retrieval |
| |
| LANL Permit |
| TA-36-8 and TA-39-6 Open Detonation Units Permit Modification |
|
TA-63 Transuranic Waste Management Facility Permit Modification
January 14, 2013 - Public Notice of Draft Permit - The Environment Department issued a Draft Permit on permit modification for the Technical Area (TA) 63 Transuranic Waste Management Facility on January 14, 2013 for public comment. The comment period ended at 5:00 MST, March 15, 2013. The Draft Permit and public notice documents are found by clicking here. |
| |
Macroencapsulation Permit Modification |
| |
TA-55 Temporary Authorization Request |
| |
E-mail notification of Electronic Information Repository
The Permittees have established an electronic Information Repository as required by Section 1.10, Information Repository, of the Los Alamos National Laboratory Hazardous Waste Permit. As part of keeping the public informed the Permittees have created an e-mail notification when documents are posted to the electronic Information Repository. To request e-mail notification click on this link. By clicking on this link it will take you to the Los Alamos National Laboratory's Waste - Monitoring, Compliance, and Risk Reduction webpage. |
| |
Compliance Order on Consent |
| Modification of Consent Order (10-29-2012) |
| Modification of Consent Order (4-20-2012) |
| Table Footnote Changes (6-19-2008) |
| Modification of Consent Order (5-13-2008) |
| Order Schedule Changes (6-29-2007) |
| Submittals under the Compliance Order on Consent |
| MDA H Remedy Selection |
| MDA B Investigation/Remediation Work Plan (SWMU 21-015) |
| MDA G |
| |
Closures |
No Further Actions |
SWMU 16-021(c) Remedy Selection (5-15-2006) |
Interim Measure for Chromium Contamination |
Well Evaluations for Intermediate and Regional Wells (4-5-2007) |
Site-Wide Environmental Impact Statement Comments |
| |
Federal Facility Compliance Agreement (FFCA) |
| |
Federal Facilities Compliance Order - Site Treatment Plan |
| |
| |
| TA-63 Transuranic Waste Management Facililty Permit Modification |
| Public Comment received during the the Department's public period - January 14, 2013 through March 15, 2013 |
| January 14, 2013 - Public Notice of Draft Permit - The Environment Department issued a Draft Permit on permit modification for the Technical Area (TA) 63 Transuranic Waste Management Facility on January 14, 2013 for public comment. The comment period ended at 5:00 MST, March 15, 2013. |
| Interested Citizen Letter and Public Notice - English |
| Interested Citizen Letter and Public Notice - Spanish |
| Fact Sheet |
| Administrative Record Index |
| Draft Permit |
| Parts 1 through 11 |
| Attachment A - Technical Area (TA) - Unit Descriptions |
| Attachment C - Waste Analysis Plan |
| Attachment D - Contigency Plan |
| Attachment G.27 - Tehcnial Area 63 Transuranic Waste Facility Closure Plan |
| Attachment J - Hazardous Waste Management Units |
| Attachment N - Figures |
| |
| Permit Modification Request and associated correspondence |
October 1, 2012 - LANL Response to Disapproval, TA-63 Transuranic Waste Facility Permit Modification Request, Revision 2.0 |
August 30, 2012 - NMED Disapproval TA-63 Transuranic Waste Facility |
| |
July 12, 2012 - LANL Response to 2nd Disapproval, TA-63 Transuranic Waste Facility Permit Modification Response, Revision 1.0 |
July 12, 2012 - LANL Response to Disapproval, TA-63 Transuranic Waste Facility Permit Modficiation Request (transmittal letter) |
 |
May 24, 2012 - NMED Dispproval TA-63 Transuranic Waste Facility |
February 14, 2012 - NMED Notice of Deficiency |
February 1, 2012 - NMED Notice of Deficiency, Administrative Completeness and Fee Letter |
October 24, 2011 - NMED TA-63 Transuranic Waste Facility Permit Modification Request |
Public Comment received during the applicants required comment period - August 25, 2011 through October 24, 2011 |
August 18, 2011 - LANL TA-63 Transuranic Waste Management Facility Permit Modification Request |
| |
| TA-55 Temporary Authorization |
| February 6, 2013 - NMED Withdrawal of Temporary Authorization Request |
| January 31, 2013 - LANL Withdrawal of Temporary Authorization Request |
| December 19, 2012 - LANL Response to Questions - Temporary Authorization Request |
| November 2, 2012 - LANL Response to NMED Questions |
| October 15, 2012 - LANL Temporary Authorization Request for Waste Repackaging Operations at Technical Area 55 |
| |
| Macroencapsulation Permit Modification |
September 27, 2012 - NMED Request for Classification Determination for Proposed Modification |
September 20, 2012 - LANL Request for Class Determination for Proposed Modification |
 |
| TA-36-8 and TA-39-6 Open Detonation Units (OD)Permit Modification |
| April 16, 2012 - LANL Request to Supplement and Correct Permit Modification Request |
| March 27, 2012 - NMED Notice of Disapproval |
| February 14, 2012 - NMED Administrative Completeness and Fee Assessment |
| Public Comment received during the applicants comment period - |
| July 19, 2011 - LANL Class 3 Permit Modification Request for the Addition of OD Units |
| |
| Closure Plans for Technical Area 16 Burn Units (11-30-2010) |
TA-16-388 (1,172 KB) |
TA-16-399 (782 KB) |
| |
| |
| MDA H Remedy Selection |
April 15, 2011 - NMED Notice of Disapproval Correective Measures Evaluation Report, MDA-H, SWMU 54-004 (5.77 MB) |
December 2010 - LANL Corrective Measures Evaluation Report for MDA H, SWMU 54-004, at Technical Area 54 (23.97 MB) |
June 16, 2010 - NMED Withdrawal of the Proposed Remedy Selection for MDA-H (456 KB) |
February 26, 2008 - NMED Status of Remedy Selection at MDA-H (182 KB) |
| February 4, 2008 - NMED Public Comment Period - The public comment period for the remedy selection for MDA H closed at 5:00 p.m. MST, February 4, 2008 |
| Comments received during the public comment period for MDA H Remedy Selection |
December 14, 2007 - NMED Public Comment Period Extension Notice |
Interested Person Letter and Public Notice (English version) (150 KB) |
Interested Person Letter and Public Notice (Spanish version) (159 KB) |
November 5, 2007 - NMED Public Notice |
Interested Person Letter and Public Notice (English version) (160 KB) |
Interested Person Letter and Public Notice (Spanish version) (172 KB) |
MDA H Fact Sheet/Statement of Basis (151 KB) |
June 2005 - LANL Corrective Measures Study Report for Material Disposal Area H, Solid Waste Managemetn Unit 54-004, at Technical Area 54, Revision 1 (26,093 KB) |
Administrative Record for MDA H Remedy Selection (41 KB) |
November 5, 2007 - NMED Approval of MDA H Corrective Measures Study Report (3,927 KB) |
|
|
|
|
Compliance Order on Consent March 1, 2005 (Revised 10/29/2012) |
Signature Page (March 1, 2005) |
| |
| Submittals Subject to Stipulated Penalties is an annual requirement under Section III.G.1 of the March 1, 2005 Consent Order. |
 List of Documents Subject to Stipulated Penalties Under the March 1, 2005 Consent Order for FY2012 (7-15-2011) |
 List of Documents Subject to Stipulated Penalties Under the March 1, 2005 Consent Order for FY2011 (7-15-2010) |
 List of Documents Subject to Stipulated Penalties Under the March 1, 2005 Consent Order (7-13-2009) |
 List of Documents Subject to Stipulated Penalties Under the March 1, 2005 Consent Order for Federal Fiscal Year 2009 (7-22-2008).
|
| |
Modification of Consent Order (10-29-2012) |
| This modfiication to the March 1, 2005 Consent Order adds Section III.Z, which requires a publicly accessible database. |
 Approval of Consent Order Modification |
 Compliance Order on Consent March 1, 2005 (Revised 10/29/2012) |
 Termination of Chromium Settlement (10/30/2012) |
  |
| |
Modification of Consent Order (4-20-2012) |
| This modification to the March 1, 2005 Consent Order changes the period groundwater monitoring from being conducted on a watershed-specific basis to a site-specific basis, and requires updates to the General Facility Information triennially. |
 Final Decision (4/20/2012) |
 Compliance Order on Consent March 1, 2005 (Revised 4/20/2012) |
| |
Table Footnote Changes |
 Final Decision (6-19-2008) |
 Compliance Order on Consent March 1, 2005 (Revised 6/18/2008) |
 Notice of Table Footnote Changes (5-15-2008) |
 Proposed Changes to the Footnotes in Tables XII-2 and XII-3 (English version) |
 Cambios Propuestos a Los Apuntes al Calce de Las Tablas XII-2 Y XII-3 (Spanish version) |
 Tables XII-2 and XII-3 |
 Redline-Strikeout version Clean version |
| |
Modification of Consent Order (5-13-2008) |
This modification to the March 1, 2005 Consent Order, adds Section IV.A.3.g, which covers the notification requirements for groundwater monitoring results. |
 Interested Person Letter - Final Decision |
 Response to Comments |
 Section IV.A.3.g Order Language Redline version  |
 Letter from NMED to Los Alamos National Laboratory |
 Public Notice of Modfiication of Consent Order (8-8-2007) |
 Interested Person Letter and Public Notice (English version) |
 Interested Person Letter and Public Notice (Spanish version) |
| |
Order Schedule Changes |
 2006 Final Decision on Order Schedule Changes |
  Interested Citizen Letter – Final Decision (6-29-2007) |
  Response to Comments (6-29-2007) |
  Tables (6-28-2007) |
  Interested Citizen Letter & Public Notice (English version)(11-27-2006) |
  Interested Citizen Letter & Public Notice (Spanish version)(11-27-2006) |
  Tables XII-1 XII-2 and XII-3   |
       |
 2005 Order Schedule Change |
  Response to Comments (03-06-2006) |
  Interested Citizen Letter and Public Notice (12-27-2005) |
  Tables XII-1 XII-2 and XII-3 (12-27-2005) |
    |
Submittals under the Compliance Order on Consent |
| |
|
|
Federal Facility Compliance Agreement (FFCA) |
 |
| The FFCA is an agreement between the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) regarding storm water discharges from Solid Waste Management Units (SWMUs) at the Los Alamos National Laboratories. The FFCA guides LANL through the monitoring and Best Management Practices to be performed while LANL goes through the application process for an individual National Pollutant Discharge Elimination System (NPDES) permit. The FFCA is an interim tool to direct protection of the environment and it will automatically terminate upon issuance of the individual permit covering the SWMUs.
Signed February 3, 2005 by John Blevins, Director, Compliance Assurance and Enforcement Division, U.S. EPA Region 6 and January 31, 2005 by Edwin L. Wilmot, Manager, Los Alamos Site Office, National Nuclear Security Administration NSA, U.S. DOE. |
|
Federal Facilities Compliance Order:
| 2012 |
NMED Approval with Modifications of Site Treatment Plan (12-10-2012) |
Site Treatment Plan, Revision 22.0 (12-10-2012) |
| |
Public Comment Period - November 2, 2012 Notice of Availability Proposed Revision 22.0 of the Los Alamos National Laboratory Federal Facility Compliance Order Site Treatment Plan Compliance Volume. |
March 30, 2012 - Submittal of Site Treatment Plan, Fiscal Year 2011 Update and Proposed Revision 22.0, Los Alamos National Laboratory, Federal Facility Compliance Order, October 4, 2995 |
 FY11 Annual Report revised version (redline/strikeout version) |
 FY11 Annual Report revised version (clean version) |
 STP Documents |
| |
| 2011 |
Approval with modification of Revision 21.0 LANL FFCO Site Treatment Plan and Response to Comments (3-21-2012) |
February 7, 2012 - Interested Person Letter and Public Notice of LANL FFCO Site Treatment Plan |
October 17, 2011 - Federal Facility Compliance Order, Annual Site Treatment Plan Update for Fiscal Year 2010 - Revision 2 (clean version) |
October 17, 2011 - Federal Facility Compliance Order, Annual Site Treatment Plan Update for Fiscal Year 2010 - Revision 2 (redline version) |
 |
| |
| 2010 |
Approval of Revision 20 LANL FFCO Site Treatment Plan and Response to Comments (11-8-2010) |
Interested Person Letter and Public Notice of LANL FFCO Site Treatment Plan (9-17-2010) |
Revised Annual Update, Revision 2 - clean version and redline version (9-17-2010) |
| |
| 2009 |
Approval Revision 19.0, Annaul Update to the Site Treatment Plan (2-4-2010) |
Interested Person Letter and Public Notice of LANL FFCO Site Treatment Plan |
Notice of Completion of Off-Site Waste Shipment Activities (3.1.8 and 3.1.9) in the Compliance Plan, Site Treatment Plan, Federal Facility Compliance Order, Los Alamos National Laboratory (10-26-2009) |
Response to the September 16, 2009, Notice of Disapproval of the Site Treatement Plan, Fiscal Year 2008 Upate, and
Revision 19.0 Proposal for Los Alamos National Laboratory's Federal Facility Compliance Order Submitted May 20, 2009 (10-9-2009) |
 Revised Annual Update, Revision 2 - clean version (10-9-2009) |
 Revised Annual Update, Revison 2 - redline version with changes (10-9-2009) |
Notice of Disapproval of the Site Treatment Plan (STP) Fiscal Year 2008 (FY08) Update and Revision 19.0 Proposal Los Alamos National Laboratory (LANL) Federal Facility Compliance Order (FFCO) Submitted May 20. 2009 (9-16-2009) |
Resbumittal of the Site Treatment Plan, Fiscal Year 2008 Update, Los Alamos National Laboratory Federal Facility Compliance Order, October 4, 1995 (5-20-2009) |
 Revised Annual Update - clean version (5-20-2009) |
 Revised Annual Update - redline version (5-20-2009) |
Submittal fo the Site Treatment Plan, Fiscal Year 2008 Update, Los Alamos National Laboratory Federal Federal Facility Compliance Order, October 4, 2995 (3-30-2009) |
 Site Treatment Plan
Federal Facility Compliance Order
Los Alamos National Laboratory FY09 Annual Update - clean version (3-30-2009) |
 Site Treatment Plan
Federal Facility Compliance Order
Los Alamos National Laboratory FY09 Annual Update - redline version (3-30-2009) |
Proposed Administrative Adjustments for the FY08 Site Treatment Plan, Revision 19 (3-26-2009) |
 |
| |
2007 and 2008 |
Public Notice of LANL FY07 Site Treatment Plan (STP) Revision 18.0 with Modifications. Public comment period began on December 10, 2008 and ended on January 9, 2009. No comments were received during the comment period. |
Approval with Modifications of the LANL FFCO Site Treatment Plan, Revision 18.0 (1-14-2009) |
Interested Person Letter and Public Notice of LANL FFCO Site Treatment Plan |
Site Treatment Plan, Revision 18.0 - redline version (12-10-2008) |
Site Treatment Plan, Revision 18.0 - clean version (12-10-2008) |
The documents listed below are correspondence relating to STP Revision 18.0. |
NMED Receipt of "Information Requested at the October 14, 2008 Meeting by the NMED..." (10-30-2008) |
Notice of Disapproval of the Response to NMEDs August 8, 2008 NOD of the STP FY2007 Update adn Revision 18.0 Proposal (10-23-2008) |
Information Requested at the October 14, 2008 Meeting By NMED (10-20-2008) |
Response to the NMED August 8, 2008 Notice of Disapproval of STP FY2007 Update and Revision 18.0 (8-28-2008) |
Notice of Disapproval of STP FY 2007 Update and Revision 18.0 Proposal Submitted May 2, 2008 (8-8-2008) |
STP FY2007 Revision 18.0 redline version (7-31-2008) |
STP FY2007 Revision 18.0 (7-31-2008) |
LANL E-mail on the Submittal of STP Revision 18.0 (7-31-2008) |
E-mails on Submital of the STP Revision 18.0 (7-3-2008) |
STP FY2007 Update and Revision 18.0 Proposal, FFCO (6-27-2008) |
STP FY2007 Update and Revision 18.0 Proposal, FFCO, Submitted May 2, 2008 (5-14-2008)
|
FY2007 STP Compliance Plan Volume Revision 18.0 (May 2, 2008) |
FY2007 STP Compliance Plan Volume Revision 18.0 redline version (May 2, 2008) |
LANL FFCO Annual STP for FY2007 STP Background Volume May 1, 2008 |
NMED Response to Extension Request ((4-29-2008) |
Request for Extension for the LANL STP (4-21-2008) |
 |
| |
Site Treatment Plan Revision 17.0 |
Approval with Modifications (6-26-2008) |
Site Treatment Plan Revision 17.0 as approved with Modifications (6-26-2008) |
Public Notice of LANL Site Treatment Plan (STP) Revision 17.0 with Modifications. Public comment period began on May 21, 2008 and ended on June 20, 2008. No comments were submitted regarding STP Revision 17.0. |
Interested Person Letter and Public Notice of LANL FFCO Site Treatment Plan |
NMED Proposed Modifications to the Site Treatment Plan, Revision 17.0 |
LANL Response to the October 5, 2007 Notice of Disapproval of the Fiscal Year 2006 (FY06) Site Treatment Plan (STP) (11-13-2007) |
| |
The documents listed below are correspondence relating to the STP Revision 17.0 submitted on March 13, 2007. |
NMED Letter on Site Treatment Plan (STP) Fiscal Year 2007 (FY07) Update and Revision 18.0 Proposal, Federal Facility Compliance Order (FFCO), Submitted May 2, 2008 (5-14-2008) |
| |
NMED Letter on Milestone Activity Compliance Dates, Site Treatment Plan (STP), Federal Facility Compiance Order (FFCO) (5-2-2008) |
| |
LANL Response to the New Mexico Environment Department Notice of Disapproval of Los Alamos National Laboratory (LANL) Site Treatment Plan (STP) Mixed TRU Waste Tracking, January 28, 2008 (4-18-2008) |
| |
NMED Letter on Los Alamos National Laboratory (LANL) Site Treatment Plan (STP) Combined Response to the October 5, 2007 Notice of Disapproval (NOD) of the Fiscal Year 2006 (FY06) STP and the Response to the NMED November 16, 2007 Addendum to the October 5, 2007 NOD for the FY06 STP (3-13-2008) |
| |
NMED Notice of Disapproval of Los Alamos National Laboratory (LANL) Site Treatment Plan (STP) Mixed TRU Waste Tracking, January 28, 2008 (3-5-2008) |
| |
LANL Site Treatment Plan (STP) Mixed TRU Waste Tracking (1-28-2008) |
| |
LANL Response to the NMED November 16, 2007 Addendeum to the October 5, 2007 Notice of Disapproval of the LANL FY06 STP, Revision 17 (1-23-2008) |
| |
NMED Response to Request for Extensions for the Los Alamos National Laboratory's (LANL) Site Treatment Plan (STP)( (12-20-2007) |
| |
LANL Request for Extension for the Los Alamos National Laboratory Site Treatment Plan (12-11-2007) |
| |
NMED Notice of Denial of Fiscal Year (FY06) Site Treatment Plan (STP), Revision 17.0 Milestone Date Extension Request (11-16-2007) |
| |
NMED Letter on Addendum to the October 5, 2007 Notice of Disapproval Site Treatment Plan (STP) Fiscal Year 2006 (FY06) Update and Revision 17.0 Proposal (11-16-2007) |
| |
NMED Request for information on STP Fiscal Year (FY) 2003-2007 Updates and Revisions 13.0-17.0 Proposals (11-16-2007) |
| |
LANL Response to the October 5, 2007 Notice of Disapproval of the Fiscal Year 2006 (FY06) Site Treatment Plan (STP) (11-13-2007) |
| |
NMED Notice of Disapproval of Site Treatment Plan (STP) FY06 Update and Revision 17.0 Proposal (10-5-2007) |
| |
LANL FY06 Site Treatment Plan, Revision 17 Milestone Date Extension Request (10-2-2007) |
| |
LANL Site Treatment Plan (STP) Fiscal Year 2006 Update and Revision 17.0 Proposal (3-13-2007) - This document has been split into two files for easier download. |
  Part 1  Part 2 |
|
|
|
|
|
|
2003 |
|
|
| |
2002 |
|
|
Closures
Closure Plan Approval with Modification - Technical Area 50, TA-50-1, Room 59 and TA-50-37, Rooms 115 and 118 and Technical Area 55, Room B38 |
|
|
| Rescission of Storage Shafts 145 & 146 |
|
|
| TA-16-401 and 406 Closure |
|
|
| TA-16-88 Closure |
|
|
| No Further Actions:
NFA (10-26-2006) |
|
|
|
| |
|
|
| |
| SWMU 16-021(c) Remedy Selection |
|
|
|
|