|
Notes:
* Prior work with PSTB:
Performance on similar work with the PSTB with
respect to such factors as control of costs,
quality of work and ability to meet schedules.
Up to five (5) points can be awarded.
II. Cost Effectiveness (cost):
This evaluation factor will be quantitatively
applied through the formula: [(low bid)/(this
bid)] x 25 = number of points.
** Resident business: If bids
are received from both nonresident and
resident businesses and the lowest responsive
bid is from a nonresident business, the PSTB
will apply, for purposes of comparison, an
in-state preference adjustment by application
of a 0.95 multiplier to the bids of resident
businesses. |