NMED WIPP Draft Permit Page
Draft Permit as of April 27, 2010
Parts
Part 1 General Permit Conditions
Part 2 General Facility Conditions
Part 4 Geologic Repository Disposal
Part 5 Ground-water Detection Monitoring
Part 8 Corrective Action For SWMUs and AOCs
List of Attachments
A General Facility Description and Process Information
A3 Drawing Number 51-W-214-W, "Underground Facilities Typical Disposal Panel"
B Hazardous Waste Permit Application Part A
C1 Waste Characterization Sampling Methods
C2 Statistical Methods Used in Sampling and Analysis
C4 TRU Mixed Waste Characterization Using Acceptable Knowledge
C5 Quality Assurance Project Plan Requirements
C6 Waste Isolation Pilot Plant DOE Audit and Surveillance Program
C7 DOE Level TRU Waste Confirmation Process
E Inspection Schedules/Procedures
F1 RCRA Hazardous Waste Management Job Titles and Descriptions
F2 Training Course and Qualification/Certification Card Outlines
G1 Technical Specifications, Panel Closure System, Waste Isolation Pilot Plant
G2 Shaft Sealing System Compliance Submittal Design Report
G2-B Shaft Sealing Construction Procedures
G3 Radiological Surveys to Indicate Potential Hazardous Waste Releases
H1 Active Institutional Controls
I Compliance Schedule (Reserved)
J Hazardous Waste Management Unit Tables
K Solid Waste Management Unit (SWMU) and Area of Concern (AOC) Tables
L WIPP Groundwater Detection Monitoring Program Plan
N Volatile Organic Compound Monitoring Plan
