These PDF files now contain the figures and drawings that are in the printed version of the Permit.
Attachments
- A - General Facility Description and Process Information - Oct 1, 2012
- A1 - Container Storage - Nov 1, 2012
- A2 - Geologic Repository - Nov 1, 2012
- A3 - Drawing Number 51-W-214-W, "Underground Facilities Typical Disposal Panel" - Nov 30, 2010
- A4 - Traffic Patterns - Nov 1, 2012
- B - Hazardous Waste Permit Application Part A - Oct 1, 2012
- C - Waste Analysis Plan - March 13, 2013
- C1 - Waste Characterization Sampling Methods - March 13 , 2013
- C2 - (Reserved) - March 13 , 2013
- C3 - Quality Assurance Objectives and Data Validation Techniques for Waste Characterization Sampling and Analytical Methods - March 13 , 2013
- C4 - TRU Mixed Waste Characterization Using Acceptable Knowledge - March 13, 2013
- C5 - Quality Assurance Project Plan Requirements - March 13 , 2013
- C6 - Audit and Surveillance Program - March 13, 2013
- C7 - TRU Waste Confirmation - March 13, 2013
- D - RCRA Contingency Plan - Dec 21, 2012
- E - Inspection Schedule, Process and Forms - Dec 21, 2012
- F - Personnel Training - Dec 21, 2012
- F1 - RCRA Hazardous Waste Management Job Titles and Descriptions - Nov 30, 2010
- F2 - Training Course and Qualification Card Outlines - Nov 30, 2010
- G - Closure Plan - Nov 2, 2011
- G1 - Detailed Design Report for an Operation Phase Panel Closure System - Apr 15, 2011
- G1-G - Technical Specifications, Panel Closure System - Oct 1, 2012
- G1-H - Design Drawings - Nov 30, 2010
- G2 - Shaft Sealing System Compliance Submittal Design Report - Apr 15, 2011
- G2-A - Material Specifications - Nov 30, 2010
- G2-B - Shaft Sealing Construction Procedures - Nov 30, 2010
- G2-E - Design Drawings - Nov 30, 2010
- G3 - Radiological Surveys to Indicate Potential Hazardous Waste Releases - Nov 1, 2012
- H - Post-Closure Plan - Nov 30, 2010
- H1 - Active Institutional Controls - Nov 1, 2012
- I - Compliance Schedule (Reserved) - Nov 30, 2010
- J - Hazardous Waste Management Unit Tables - Apr 15, 2011
- K - Solid Waste Management Unit (SWMU) and Area of Concern (AOC) Tables - Apr 15, 2011
- L - WIPP Groundwater Detection Monitoring Program Plan - Oct 1, 2012
- M - Figures (Reserved) - Nov 30, 2010
- N - Confirmatory Volatile Organic Compound Monitoring Plan - May 8, 2012
- N1 - Hydrogen and Methane Monitoring Plan -Jan 31, 2012
- O - Mine Ventilation Rate Monitoring Plan - May 8, 2012
|